DSI ALWAG Systems CT-Bolt

CT-Bolt TM

System Description

  • Combination rock bolt
  • Application as temporary and long-term ground control system
  • Immediate point anchorage in terms of an expansion shell anchor
  • Post-grouting assembly features double corrosion protection
  • Fully automated or manual bolt installation

DSI ALWAG Systems CT-Bolt
  1. Anchor nut
  2. Dome-shaped grouting adapter
    (with grouting hole and welded-on sleeve)
  3. Polyethylene sleeve
    (with ribbed geometry for an optimum load transfer and inner centralizers)
  4. Bolt plate
    (incl. bore for grout discharge)
  5. Rebar rock bolt
    (with cold-rolled threads on both ends for mounting the expansion shell and the anchor nut)
  6. Expansion shell

Field of Applications

Main applications of the CT-Bolt TM:

  • Systematic permanent reinforcement of underground excavations
  • Ground support for areas with limited or no access during operational lifetime
  • Mining: permanent roadways and excavations
  • Hydropower and underground oil or gas storage caverns
  • Sub-sea and sewer tunnels

Installation Procedure

CT-Bolt Installation Procedure

  • Borehole drilling
    • Drilling of a borehole Ø 44-51 mm
    • Recommended borehole length: about 100 mm longer than the bolt length
  • Bolt installation
    • Insertion of the assembled CT-Bolt TM into the pre-drilled borehole
    • Pressing the bolt plate firmly against the excavation surface
    • Activation of the expansion anchor by pre-stressing of the anchor nut provides immediate point anchorage
    • Typical required torque: 200-300 Nm
  • Flexible bolt grouting
    • Preparation of either mortar or cement according the given specifications
    • Connection of an injection adapter to the grouting adapter of the CT-Bolt TM
    • Primary grout flow inside the polyethylene sleeve towards the bolt’s toe (expansion shell) - complete grout coverage of the rebar
    • Secondary grout flow outside the polyethylene sleeve until the grouting medium flows out at the bore for grout discharge at the hemispherical bolt plate
  • Fully automated installation
    • Optional automation unit available

Technical Features

 

  • Combination rock bolt
    • Active reinforcement by pre-stressing of the expansion anchor
    • Allowance of a certain amount of elastic deformation of the rebar induced by displacements of the rock mass
    • Flexible grouting behind the working face allows an optimum adoption of the CT-Bolt TM to given ground and operating conditions
    • Optimum alignment and assurance of complete grout coverage of the of the rock bolt by the polyethylene sleeve
  • Unique choice of the corrosion protection level
    • Protection of the load-bearing components of the CT-Bolt TM according to given levels of corrosive environments
    • Bolts are available black, hot dip galvanised, or with a special Combi Coat® (combination of hot-dip galvanizing, zinc phosphate, and powder coating)
    • Indicated lifetimes for load-bearing components of the fully-grouted CT-Bolt TM by accelerated corrosion tests performed by Vik Ørsta AS from 50 (black type) to 150 (Combi Coat ® type) years
  • Rock bolt testing equipment
    • Rock bolt testing provides a quality control of the rock bolt system behaviour in combination with given ground conditions
    • Bolt load indicators and custom-specific pull test kits are provided upon request

Specifications and Prime Advantages of the CT-Bolt TM

 

ParameterUnitCT-M20CT-M22
Outer Rebar Diameter[mm]18.521.732
Thread Designation[mm]M20M22
Characteristic Yield Load 1)[kN]140230
Characteristic max. Tensile Load 1)[kN]170290
Borehole Diameter Range[mm]44 -51 2
Delivery Lengths[m]1.5 - 6.0 3

1) After grouting
2) Expansion shells for larger borehole diameters available on request
3) Delivery lengths up to 8.0 m are available on request

 

Prime Advantages

  • Combination rock bolt
    • Efficient, practically proven, and reliable rock reinforcement system
    • Combination of an immediate point anchorage and a fully grouted rock bolt
    • Immediate load-bearing capacity after installation by the mechanical anchor
    • Fast installation and flexible post-grouting behind the working face
    • Double corrosion protection by the polyethylene sleeve and grout coverage
    • Easy adjustment of the corrosion protection level to costumer demands
    • Fully automated or manual installation procedure